Acushnet Conservation Commission Faces Debates Over Construction Compliance and Environmental Impact
- Meeting Overview:
The Acushnet Conservation Commission meeting centered on discussions about compliance and environmental concerns associated with local construction projects, particularly those impacting wetlands. Key debates emerged over drainage management, the use of construction materials, and the adherence to approved plans, as stakeholders voiced differing views on compliance and environmental protection.
The discussions were notably intense regarding a project on Mapper Road, where changes to the site’s grading and wall structures were scrutinized. A participant identified as Mr. Devenian raised concerns about modifications to the project, including the extension of a concrete block wall by 18 feet and alterations to site grading. He argued that these changes deviated from the original plans, potentially breaching compliance with the Wetlands Protection Act. The alterations were said to affect the natural flow of water, directing it towards adjacent properties and raising questions about the project’s adherence to environmental standards.
Participants expressed differing perspectives on whether these modifications required a new Notice of Intent (NOI) or could be addressed through amendments. A representative for the project, Mr. Fet, contended that the changes were within compliance and necessary for site stability, asserting that the existing materials were reused without introducing new fill. However, opposition argued that the modifications constituted substantial changes, warranting further scrutiny by the commission.
Further complicating the discourse was the issue of roof runoff drainage into wetlands. Mr. Fet acknowledged that roof leaders connected to the septic system initially, and if disconnected, runoff would flow to the lawn and ultimately into wetlands, carrying potential contaminants. This sparked debate about the environmental implications of different drainage methods and whether the current setup provided adequate protection.
In a separate segment of the meeting, the commission addressed the use of crushed materials in construction, particularly concerning their environmental impact when exposed to runoff. The conversation highlighted the ongoing construction project on Percher Street, where repurposed materials, including processed asphalt and crushed concrete rubble, were used for roadways. While such materials were deemed beneficial for construction, concerns were raised about their exposure to watershed-sensitive areas and potential groundwater contamination.
This discussion led to a broader examination of stormwater management regulations and their applicability to single-family homes. Participants noted an exemption in the bylaws for disturbances under 40,000 square feet, which applied to the project in question. Despite this technical exemption, there was a consensus on the responsibility to manage stormwater appropriately to mitigate environmental impact. Participants expressed frustration over delays in progressing with the road project and questioned the commission’s hesitance, with some calling for clarity and resolution.
The meeting also touched on procedural matters, including the necessity of consulting town council to clarify next steps amid the procedural challenges faced by the commission. The lack of a quorum prevented immediate voting on enforcement actions, necessitating further deliberation and consultation.
James Kelley
Environmental Commission Officials:
Ryan Rezendes, Everett Philla, Eric Debarros, Heidi Pelletier, Douglas Thomas, Christian De Sousa, James Souza, Joann Demello (Senior Clerk)
-
Meeting Type:
Environmental Commission
-
Committee:
-
Meeting Date:
07/09/2025
-
Recording Published:
07/10/2025
-
Duration:
109 Minutes
-
Notability Score:
Routine
Receive debriefs about local meetings in your inbox weekly:
-
State:
Massachusetts
-
County:
Bristol County
-
Towns:
Acushnet
Recent Meetings Nearby:
- 12/06/2025
- 12/06/2025
- 50 Minutes
- 12/06/2025
- 12/06/2025
- 115 Minutes