Chelmsford Zoning Board Denies Variance Request Amid Concerns Over Non-Conforming Lots

The Chelmsford Zoning Board meeting focused on significant land use and zoning issues, including the denial of a variance request for a property on Columbia Street and Minor Avenue, A discussion on a multifamily residence parking expansion at Four Pallet Drive, and deliberations over environmental impacts concerning a five-unit housing project.

32:16At the forefront of the meeting was the denial of a variance request concerning the properties on Columbia Street and Minor Avenue. The applicant sought to modify the land between two non-conforming lots, which would result in 10 Minor Avenue becoming non-conforming due to a reduced lot area, alongside another variance for a reduced rear setback. The board ultimately voted four to one against the proposal. Concerns were raised about whether the slope and existing conditions constituted a sufficient hardship to justify the variances. Some board members argued that the practical use of the garage and historical access through Columbia Street did not present an adequate basis for altering the zoning requirements. The vote followed a debate about the need to maintain community standards and the implications of setting a precedent for similar requests.

0:00In parallel, the board evaluated a proposal from Four Pallet Drive LLC for a special permit related to a residential parking lot expansion. This proposal aimed to resolve parking inadequacies for a multifamily residence, addressing historical reliance on off-site parking that had raised concerns about emergency vehicle access. The project sought to maintain existing parking spaces while expanding the access drive to accommodate fire trucks, with adjustments to ensure compliance with green space and wetland protection. The proposal received approval from the Conservation Commission and the Planning Board, and efforts were made to align it with town regulations regarding floodplain storage requirements.

1:50:34The board also navigated the issues surrounding a five-unit housing project, where the applicant proposed shifting from a septic system to a sewer connection, addressing feedback from the North Chelmsford Water District. The project team emphasized compliance with stormwater management standards and engaged in discussions with town departments to ensure environmental protection. However, public concerns persisted, with residents expressing skepticism about the adequacy of environmental site assessments and the potential for groundwater contamination. The board deliberated on waivers related to environmental impact reports and sewer connections, ultimately granting the waivers unanimously.

1:31:38Concerns about sewer capacity were raised, particularly in the context of Chapter 40B projects, which were noted to demand more capacity than anticipated. The need for inflow and infiltration studies was emphasized to alleviate capacity issues. Residents voiced frustration with the perceived inevitability of development, citing state laws that favor housing projects under the 40B statute. The board acknowledged the challenges of navigating state regulations while striving to advocate for community interests.

Note: This meeting summary was generated by AI, which can occasionally misspell names, misattribute actions, and state inaccuracies. This summary is intended to be a starting point and you should review the meeting record linked above before acting on anything you read. If we got something wrong, let us know. We’re working every day to improve our process in pursuit of universal local government transparency.

Receive debriefs about local meetings in your inbox weekly:

is discussed during:
in these locations: