Overview: The Acushnet Planning Board convened to discuss a significant subdivision proposal for a property on Keen Road, with key revisions to the initial plan, including stormwater management and lot configurations. The proposal, by AMN Estate Holdings LLC and engineered by Fing Corporation of Fair Haven, Massachusetts, outlined a six-lot subdivision with a single access street, adjustments to stormwater basins, and the addition of street trees. The plan also addressed concerns raised in previous meetings, such as intersection sight distance, lot six configuration, and stormwater basin maintenance. A point of discussion revolved around the sequence of construction, specifically the installation of the infiltration basin and road surface binder coat. The meeting concluded with a motion to continue the public hearing to May 2nd, 2024, awaiting review by the Conservation Commission on stormwater management before any approval can be considered.