- Filters
- NJ
- Monmouth County
- 5/1/25
- 05/06/2025
- 35 Minutes
- Noteworthy
- Highly Noteworthy
- Routine
Overview: In a recent meeting of the Ocean Township Environmental Commission, discussions unfolded around the postponement of the town’s Green Fest, ongoing issues with a recycling contest, and various environmental concerns, including drainage problems and tree management.
- MA
- Hampden County
- 5/1/25
- 05/02/2025
- 61 Minutes
- Noteworthy
- Highly Noteworthy
- Routine
Overview: The recent Southwick Board of Health meeting focused on aligning the payment structure of Health Director Thomas Hibert’s stipend with the stipulations of the Mass DPH Public Health Excellence Grant, alongside discussions about pandemic preparedness, septic system approvals, and housing inspections.
- MA
- Barnstable County
- 5/1/25
- 05/02/2025
- 112 Minutes
- Noteworthy
- Highly Noteworthy
- Routine
Overview: The Falmouth Zoning Board of Appeals recently tackled several complex cases, with a portion of their meeting dedicated to discussions on whether a proposed living space above a garage should be classified as an accessory dwelling unit (ADU).
- MA
- Bristol County
- 5/1/25
- 05/01/2025
- 19 Minutes
- Noteworthy
- Highly Noteworthy
- Routine
Overview: During the Acushnet Planning Board meeting on May 1, 2025, members held a public hearing to discuss proposed amendments to the town’s general bylaw regarding large-scale ground-mounted solar photovoltaic installations. These changes are prepared for the 2025 annual town meeting. The board debated the necessity of periodic inspections during construction. Members noted that this could prevent issues like those experienced at site 550 due to improperly built stormwater retention ponds. The board ultimately recommended the amendment for approval at the town meeting.
- MA
- Suffolk County
- 4/30/25
- 04/30/2025
- 272 Minutes
- Noteworthy
- Highly Noteworthy
- Routine
Overview: In a concerted effort to bolster climate resilience, the Boston City Council unanimously approved the acceptance and expenditure of a nearly $2 million grant for the East Boston waterfront’s Carlton Wharf and Lewis Small Resiliency Project. This initiative aims to address high-risk flood pathways, crucial for protecting vulnerable neighborhoods during severe weather events.