Port Orange Planning Commission Tackles Traffic and Development Concerns
-
Meeting Type:
Planning Board
-
Meeting Date:
01/25/2024
-
Recording Published:
01/25/2024
-
Duration:
125 Minutes
-
State:
Florida
-
County:
Volusia County
-
Towns:
Port Orange
- Meeting Overview:
The Port Orange Planning Commission’s recent meeting centered on the discussion of a significant proposed development in the Hammock Preserve area, with a particular focus on the impact on traffic, stormwater management, and infrastructure. Residents and commission members alike scrutinized the potential challenges arising from the addition of a large mixed-use project, which includes 873 multifamily units and 40,000 square feet of commercial space. The plan proposes to cluster units onto one parcel, leaving adjacent areas as open space and drainage.
At the forefront of the discussions were the concerns related to the proposed development’s traffic impact. A detailed traffic analysis was presented, which highlighted that the peak hour traffic from the proposed uses would be less than the traffic from existing uses due to a change in uses causing trips to go outside the peak hours. Nonetheless, residents voiced worries over increased congestion, especially at the intersection of Clyde Morris and Madeline. The possibility of widening the overpass as part of Williamson’s upgrades was debated.
Stormwater management was another topic, with presentations addressing the existing drainage on the site, the flow of water to the canals, and the proposed stormwater systems. The development aims to match pre- and post-development water flow rates and includes compensating storage to address the loss of floodplain storage due to the development. There was a discussion regarding the responsibility for maintaining the B19 canal, owned by the county, and the potential effects of the new development on drainage and flood patterns. The commission members sought clarity on the stormwater management features’ specific design and function, including the depth and purpose of the ponds and the water flow between the parcels and canals.
Building height was also a point of contention. The development requested a deviation from the Land Development code regarding building heights, prompting discussions on the proposed architectural design and its impact on the surrounding area. Public comments reflected concerns about the five-story building height, which some residents deemed excessive for the area.
Furthermore, the meeting touched upon the environmental impact and the preservation of natural landscapes within the development area. Residents expressed their preference for single-family development over large-scale apartment homes and were apprehensive about the visual impact on adjacent suburban residential zones. The balance between development and maintaining the neighborhood’s natural surroundings was a recurring theme, with an emphasis on sustainability and the community’s standards of living.
The dialogue between residents, commissioners, and the applicant’s representatives underscored the complexities of urban planning. The applicant’s team, comprising various firms, emphasized the project’s phased development over 5 to 10 years, adhering to existing regulations and processes. The vision for the site incorporated a modern Coastal floor architectural style with an emphasis on open spaces. Despite assurances from the developers about responsible development and infrastructure planning, the commission and community members remained focused on the long-term vision and the need to address current and future infrastructure challenges.
Donald O. Burnette
Planning Board Officials:
-
Meeting Type:
Planning Board
-
Committee:
-
Meeting Date:
01/25/2024
-
Recording Published:
01/25/2024
-
Duration:
125 Minutes
-
Notability Score:
Routine
Receive debriefs about local meetings in your inbox weekly:
-
State:
Florida
-
County:
Volusia County
-
Towns:
Port Orange
Recent Meetings Nearby:
- 10/30/2024
- 10/31/2024
- 41 Minutes
- 10/30/2024
- 10/30/2024
- 128 Minutes
- 10/30/2024
- 10/30/2024
- 382 Minutes