Southampton Planning Board Approves Resubmitted Stormwater Management Permit for Red Barn Storage
- Meeting Overview:
The Southampton Planning Board convened on November 19th to review a resubmission for a stormwater management permit for Red Barn Storage on College Highway. The permit, originally approved in December 2022, expired, necessitating a reapplication. The board approved the resubmitted application.
The meeting’s focal point was the re-approval of the stormwater management permit for Red Barn Storage. Representatives, including Mark Reed from Heritage Surveys and Engineering, confirmed that the plans were identical to those previously sanctioned. The project involves the development of storage units with interior access and climate control features. The board discussed technical details, such as the stormwater drainage system and the connection to town water.
Further discussion centered on compliance with previous conditions set by the board, including a performance guarantee of no less than $61,600 and adherence to inspection schedules. The board waived the requirement for an oil and water separator, provided there is no outside storage of vehicles or mechanical equipment.
Scott Szczebak
Planning Board Officials:
Not Online
-
Meeting Type:
Planning Board
-
Committee:
-
Meeting Date:
11/19/2025
-
Recording Published:
11/20/2025
-
Duration:
22 Minutes
-
Notability Score:
Routine
Receive debriefs about local meetings in your inbox weekly:
-
State:
Massachusetts
-
County:
Hampshire County
-
Towns:
Southampton
Recent Meetings Nearby:
- 12/04/2025
- 12/04/2025
- 106 Minutes
- 12/04/2025
- 12/05/2025
- 142 Minutes
- 12/04/2025
- 12/05/2025
- 95 Minutes