In the latest Westport Conservation Commission meeting, several development proposals were scrutinized, with the primary focus on addressing environmental impacts and ensuring compliance with local regulations. The commission evaluated proposals for new constructions within wetland buffer zones, debated the necessity of setbacks, and deliberated on best practices to preserve sensitive ecological areas.
One notable matter involved a Notice of Intent for constructing a single-family dwelling on River Road. The proposal, represented by a Bay Group representative on behalf of Jenna Asserly, included plans for a home, garage, driveway, terrace, pool, septic system, well, and a detention basin, all within a buffer zone adjacent to vegetated wetlands. The site presented notable challenges due to surrounding wetlands and steep topography, making access and environmental protection a focal point of the discussion.
A significant component of the debate centered around the proposed driveway, which required a crossing over bordering vegetated wetlands (BVW) and an intermittent stream. The design incorporated a culvert that met Massachusetts stream crossing standards, yet the alteration would affect approximately 4,300 square feet of BVW. To mitigate this, the plan included creating 9,000 square feet of new BVW in two replication areas. Concerns were raised about potential flooding and stormwater management, with assurances given that the system was designed to maintain pre-construction to post-construction runoff levels.
The size of the proposed home, exceeding 5,000 square feet, sparked considerable debate. Concerns were voiced about whether such a large structure was appropriate for the site’s conditions, with suggestions to reduce the home’s size or reposition it to minimize grading in the 25-foot no-alteration zone. Nevertheless, the commission showed a preference for minimizing encroachment in the no-alteration zone, proposing adjustments to the house position as a potential solution.
The commission recommended a continuance of the hearing, granting the applicant time to address the concerns raised. The representative expressed a willingness to consider modifications, recognizing the engineering challenges while emphasizing the goal of minimizing environmental impacts.
Another discussion involved a property where landscaping activities raised concerns about encroachment on wetland areas. Speakers emphasized the need for permanent barriers to prevent such occurrences, with one stating, “if that was the case, we’re going to ask for something that’s a permanent barrier that you can’t go beyond.” This highlighted ongoing issues related to maintaining setbacks to protect wetlands.
A procedural dilemma arose over whether to approve the project conditionally or continue the discussion for further examination. The debate focused on enforcing a 25-foot setback, with members expressing varying perspectives on the feasibility of such a requirement given the existing design. A conditional approval was proposed, allowing the applicant to present a final plan compliant with setback regulations without necessitating another hearing.
The property in question was described as having a high perch water table, complicating drainage and water management. The commission weighed the benefits of a conditional approval against granting a continuance, ultimately deciding to allow the applicant to revise their proposal to better meet setback expectations.
In addition to these discussions, the commission also addressed several other development requests. A Request for Determination of Applicability from David Mendy’s was approved for a single-family dwelling and garage on Forge Road, located within a buffer zone and riverfront area. The commission noted that the total disturbed area was minor and voted unanimously for approval with conditions.
A Notice of Intent for a garage construction at 46K Bio Lane was also approved. The proposal involved a 28×12 garage and minor gravel driveway widening, with erosion control measures in place to protect nearby wetlands. The commission acknowledged the site constraints and approved the project with standard conditions.
Furthermore, a trench for utilities on Drift Road was approved, with assurances that the excavation would cause minimal disturbance. The commission emphasized the importance of erosion control until disturbed areas were stabilized.
The meeting concluded with routine administrative tasks, including the approval of certificates of compliance for completed work on docks, seawalls, and accessory dwelling units, all receiving unanimous approval from the commission. Administrative discussions covered billing approvals and documentation processes, with a reminder of the challenges anticipated in future meetings.
Jim Hartnett
Environmental Commission Officials:
Paul Joncas, Kevin Carter, Philip M. Weinberg, Jason Powell, Thomas Merchant, Burton Bryan, Jacob McGuigan
-
Meeting Type:
Environmental Commission
-
Committee:
-
Meeting Date:
09/02/2025
-
Recording Published:
09/02/2025
-
Duration:
48 Minutes
-
Notability Score:
Routine
Receive debriefs about local meetings in your inbox weekly:
-
State:
Massachusetts
-
County:
Bristol County
-
Towns:
Westport
Recent Meetings Nearby:
- 12/30/2025
- 12/31/2025
- 74 Minutes
- 12/29/2025
- 12/29/2025
- 20 Minutes
- 12/29/2025
- 12/29/2025
- 31 Minutes