- Meeting Overview:
In a detailed examination of property titles and subdivision plans, the Westport Planning Board tackled the multifaceted challenges of land ownership, access rights, and environmental regulations during its recent meeting on August 13.
The board’s primary focus was the endorsement of an Approval Not Required (ANR) plan for two lots located on Crane Avenue. The applicant’s representative described a peculiarly shaped lot and proposed creating a new compliant lot with sufficient frontage and upland area. The new lot, AP 24 Lot 27A, would feature 2,246 feet of frontage, while the remaining lot, containing an existing single-family home, would have 1,808.7 feet of frontage after reconfiguration. A board member raised concerns over the narrow 18-foot-wide access stretch, currently in use, which connects to the main area. The representative explained that despite the complex histories of these access roads, they are deemed sufficient for the intended use.
The board confirmed that the plan complied with Massachusetts General Laws and endorsed it after a board member recused themselves due to a conflict of interest related to the trust involved. The motion passed without opposition.
Following the ANR discussion, a pre-application consultation for a proposed subdivision plan by applicant Alons Koka concerning zero Railroad Park was held. Initial findings revealed potential access through a paper street established in 1933, which might involve crossing wetlands. The representatives noted ongoing consultations with the Conservation Commission, emphasizing the need for their approval before submitting a definitive subdivision plan. The board discussed the complexities of developing on paper streets and the legal implications of gas easements.
Further complicating the meeting were discussions on the implications of developing within areas containing existing gas lines and wetlands. The board emphasized preserving natural resources while addressing development needs. Specific concerns were raised about Bentley Lane’s completion for a connection to Highland Avenue and the feasibility of connecting proposed roads to existing infrastructure. The dialogue highlighted the necessity for additional research to determine whether a gravel road could coexist with the gas line, focusing on safety and regulatory requirements.
In another discussion, a representative for the trust managing certain properties presented the ongoing challenges of clarifying convoluted titles. The representative detailed the two-year effort to resolve these issues, which have been compounded by the lack of written agreements and historical claims dating back to 1903. The complexities of easements and rights over disputed lands were contentious, with the representative underscoring the need for thorough title investigations to avoid potential conflicts and risks for investors.
The potential approval of a rural residential lane that could allow for the development of four to six lots was also discussed. The board considered whether this approval would benefit only current applicants or be available on a first-come, first-served basis. Emphasizing the importance of increasing housing options amidst a local housing crisis, participants highlighted the need for attainable pricing and the challenges of the current real estate market. The role of utility companies, particularly a gas company, in determining road construction specifications was also clarified.
The meeting also addressed the implications of offshore wind energy on Westport. Concerns were raised about how power from offshore sources would be integrated into the local grid, with discussions on possible routes for bringing the power ashore and the associated infrastructure like substations. Despite some skepticism about the necessity of forming a committee to address this issue, participants acknowledged the potential benefits and the importance of preparing for any implications.
Concerns over new transmission towers and their electromagnetic impact were raised, with references to similar projects in other areas. The board transitioned to public hearings for properties at 720 to 726 Old County Road and State Road, both of which were continued to future dates due to pending revisions and surveys. The assistant planner and town planner provided updates on various projects, including the Wapa Connector bike trail and a draft housing production plan.
Jim Hartnett
Planning Board Officials:
James T. Whitin, Robert Daylor, John Bullard, Mark L. Schmid, Manuel Soares, Nadine Castro (Assistant Planner II), Michael Burris (Town Planner, Aicp), Amy Messier (Assistant Town Planner)
-
Meeting Type:
Planning Board
-
Meeting Date:
08/13/2024
-
Recording Published:
08/13/2024
-
Duration:
115 Minutes
-
Notability Score:
Routine
Receive debriefs about local meetings in your inbox weekly:
-
State:
Massachusetts
-
County:
Bristol County
-
Towns:
Westport
Recent Meetings Nearby:
- 10/22/2024
- 10/22/2024
- 86 Minutes
- 10/22/2024
- 10/23/2024
- 88 Minutes
- 10/22/2024
- 10/22/2024
- 50 Minutes